Vostok TOMS- project LLC
Vostok TOMS- project LLC is 100% affiliate company of TOMS engineering LLC. The company was established on the basis of the Trans- Baikal branch of TOMS engineering on 14 July, 2014 in Chita. The office is located at the business centre at the following address: 672010 Chita, Trans- Baikal territory, Kransoyarskaya str., 32 А office 306.
Natalia Serebryakova is the CEO of Vostok TOMS- project LLC. Yury But`ko is the chief engineer.
|
Vostok TOMS- project LLC provides set of services for mining enterprises, as well as elaboration of project documentation at all stages from FS to working documentation.
Pre - project works:
- Conceptions of deposits development;
- All kinds of FS;
- Justification of investments;
- Elaboration of project documentation;
- Elaboration of detail engineering;
- Environment impact analysis;
- Project maintenance in the State Expert Evaluation Department of the Russian Federation (Glavgosexpertiza RF), Central Committee for solid mineral deposits development of Rosnedra and others;
- Design supervision.
Vostok TOMS- project LLC is fitted with up-to-date equipment, computing technologies and certified software systems. Company`s personnel possess a unique experience in elaboration of project documentation for construction, reconstruction and major capital works of mining and industrial enterprise.
List of largest performed projects:
- Technical re-equipping of Abagurskaya processing plant, productivity 5.8 Mtpa, positive expert conclusion.
- Ildikanzoloto LLC, gold ore industrial development deposit. Production extension 1.7 Mtpa.
- Rudnik Berezitovy LLC. Treatment of out-of-balance ores at Berezitovoe deposit, heap leach. Productivity 100 Ktpa.
- Baikalrud LLC. Processing plant on polymetallic ores treatment at Noyon- Tologoy deposit with utility objects. Productivity 600 Ktpa.
- Dalgraphite LLC. Dalgraphite mining and processing plant. Topolikhinsky graphite ore quarry, productivity 340 Ktpa.
- Vismut JSC. Construction of mining and processing plant at Zhelezny kryazh deposit, productivity 700 Ktpa.
- Rudnik Aleksandrovsky JSC. Aleksandrovsky mining and processing plant. Site № 1, pit productivity 750 Ktpa.