About us
Home About us TOMS- project PLC (Kazakhstan)
TOMS- project PLC
The company was established in 2010.
The office is located at the following address:
100019 Republic of Kazakhstan, Karaganda, Ermekova str., 29, office 405.
Yury Stolbchenko is the CEO.
Provided services:
Elaboration of project documentation at all stages: FS, Design criteria, project documentation and detail engineering.
Design objects:
- Mining and processing facilities;
- Open pits and subsurface mines;
- Processing plants;
- Mining and mixed production;
- Hydro- technical utilities;
- Infrastructure objects.
List of largest performed projects:
Altyntau Kokshetau PLC (Vasilkovsky mining and processing plant)
Gold ore mine development, open-pit mining, productivity 8 Mtpa. Functions of planner (Working project) – 2008.
Syrymbet JSC, Syrymbet mining plant
Elaboration of Design Specifications and Estimates for construction of mining and metallurgical enterprise specializing in tin ore extraction, productivity 1 Mtpa. Functions of planner.
Design objects:
- Processing plant;
- Tail facility;
- Hydrometallurgical workshop.
EuroChem Fertilizers PLC
Development of Kok-Djon phosphate ore deposit (Araltobe, Kesiktobe) and Gimmelfarbskoye. Functions of general planner.
Design objects:
- Quarry;
- Infrastructure objects.
Varvarinskoye JSC
Reconstruction of gold recovery and processing plant (project documentation and detail engineering). Functions of General planner.
Design objects:
- Unit of pre-leaching;
- Unit of scavenger flotation.
Kazakhmys PLC
Dewatering of Abyz quarry. Functions of general planner.
Design objects:
- Dewatering wells;
- Water conduit.